Get in Touch
Software & TechnologyClient · Aubilities6-month engagement

Moving a live platform off its Laravel monolith — with zero downtime

A gradual, parity-first migration of Aubilities' Laravel monolith onto a modular NestJS + Next.js architecture — keeping the live platform serving throughout a dedicated 6-month engagement.

Headline result
Zero
Downtime by design — the live platform never stops serving
6-month engagement3 senior engineersUnited Kingdom
Client
Aubilities
Industry
Software & Technology
Duration
6-month engagement
Team
3 senior engineers
Services
Software ModernizationProduct EngineeringDevOpsCloud Optimization
01 · Where they started

The challenge.

Aubilities' platform ran on an aging Laravel monolith that had become the core orchestration hub — increasingly costly to scale, maintain and reason about. They needed to modernize onto a modular NestJS + Next.js architecture without disrupting a live system, while cutting cloud complexity and operational cost. The migration had to be gradual, low-risk and reversible — preserving existing behavior and data at every step.

Tech stack
Laravel (legacy)NestJSNext.jsTypeScriptNode.jsMySQL → PostgreSQLAWS
02 · How we shipped it

Our approach.

01

Discovery & architecture design

Audited the Laravel system end-to-end — mapping modules, APIs and data models — then produced a NestJS + Next.js blueprint with a phased, low-risk migration roadmap.

02

Parity-first, gradual migration

Moved module-by-module behind feature flags with parallel execution, validating each piece against legacy behavior before cutover. No big-bang rewrite, no surprise regressions.

03

Platform foundation & DevOps

Stood up the NestJS / Next.js base in TypeScript with CI/CD pipelines, clean environments, and logging, monitoring and security standards baked in from day one.

04

Database & cloud optimization

Kept MySQL live during migration, then moved to PostgreSQL once full feature parity was reached — consolidating AWS services to cut cost and operational complexity.

03 · What it delivered

Outcomes that compound.

Zero
Downtime during migration
The live platform keeps serving via parallel runs + feature flags.
8–10
Weeks to first migrated platform
Phased rollout, validated module-by-module per the plan.
100%
Parity gate before each cutover
Every module proven against legacy behavior before go-live.
04 · How it unfolded

Timeline.

Phase 1
Discovery & architecture blueprint
Phase 2
Platform foundation, CI/CD & standards
Phase 3
Controlled module-by-module migration
Phase 4
Stabilization & optimization
Phase 5
PostgreSQL migration & Laravel decommissioning
Phase 6
Ongoing enhancements & scaling
A
Draft · awaiting client approval
"Stafflink moved us off a monolith we'd been wary of touching — module by module, with the platform live the whole way through."
AubilitiesFounder, Aubilities
Placeholder testimonial — we'll swap in the approved quote and named attribution once Aubilities signs off.

Have a similar shape of problem?

Book a 30-min call with the practice lead who shipped this engagement.

All case studiesTalk to an expert